Zambian 2013 Budget Reviewed by Kampamba Shula

On 12 October 2012, the Minister of Finance, Hon. Alexander Bwalya Chikwanda, MP, announced the 2013 National Budget. Budget highlights and taxation and other changes as contained in the Budget speech and the Zambia Revenue Authority (“ZRA”) publication.

INDECO (IDC): Past Problems and Opportunities Analysed by Kampamba Shula

INDECO (IDC): Past Problems and Opportunities Analysed

Critical Review of IMF 2013 Zambia ARTICLE IV CONSULTATION report by Kampamba Shula

Debt management is still on track The agreed norm is that for internal borrowing the threshold is 25 per cent of GDP but our debt stands at K17 billion, which is 15 per cent of GDP and for external borrowing, the threshold is 40 per cent and our debt is US$3.1 billion which is 14 per cent of GDP, so we are far below the agreed norms. So even in the long term , Zambia is still on track.

US Economy 2014 First Quarter Analysis and Outlook by Kampamba Shula

New data shows the U.S. economy contracted in the first quarter of this year, keeping pace with shifting expectations but down sharply from the prior already disappointing estimate.

Zambia Debt Analysis

Some might say that Zambia should not borrow externally and even as sincere as they may be they are wrong. When the Government borrows locally “Crowing out” happens.

Showing posts with label EuroBond. Show all posts
Showing posts with label EuroBond. Show all posts

Wednesday, October 16, 2013

Zambia 2014 Budget Analysis by Kampamba Shula




2014 Budget Analysis
On the 11th October 2013 , the honorable Finance minster presented the 2014 Budget address to the national assembly.This is an analysis based on  the information in the Address. All Graphs and Calculations belong to to the author and no claim can be made by any who choose to use the analysis in this article.
Overview of the Global and Domestic Economy Sectors in 2013
The global economy continues to recover slowly with global growth projected at 2.9%.This underscores the slowdown in emerging markets like Brazil, Russia, China and India whose growth in the recent years has been a pillar of the global economy. Weaker growth in the United States and the extended effects of the Eurozone recession have looked to further undermine global growth.
Sub-Saharan Africa’s performance has been relatively stronger in light of this with a real Gross Domestic Product (GDP) projected at 5%.
Commodities

Commodity prices have generally been lower in 2013 compared to 2012 partly due to lower demand form emerging Market like China and increased supply by copper producers like Chile. Copper prices fell from an average of US$7,960 per metric tonne in 2012 to US$7,416 between January and September 2013 (see graph above).
Zambia’s GDP growth is projected to remain strong above 6%.This is on the backdrop of strong performance in the mining, construction,manufacturing ,transport and communication sectors. With the decline in agricultural output, this projected out turn is lower than our budget forecast of above 7 percent

Inflation


In 2013, monetary policy focused on achieving an end-year inflation of 6 percent. As at end-September, 2013, inflation remained above target at 7 percent, following inflationary pressures largely associated with the removal of fuel and maize subsidies. To address these inflationary challenges, the Bank of Zambia raised the Policy Rate over the first half of the year to 9.75 percent from 9.25 percent in December, 2012. To complement this, the Central Bank undertook aggressive open market operations to curb money supply growth.

Lending rate

Average commercial bank lending rates have remained relatively stable at 16.5 percent as at end-September, 2013. The Government still believes that these rates are unacceptably high and are holding back domestically financed investments.

Exchange Rate


With regard to the exchange rate, this has stabilized at around K5.4 to the US dollar, reflecting improvement in the supply of foreign exchange during the third quarter of 2013.

Exports of gemstones, cement, electricity, sugar, tobacco, cotton lint, maize and maize seed all registered strong growth and this demonstrates the increased diversification and resilience of the Zambian economy
Gross International Reserves as at end-September 2013 stood at US$2.7 billion, about US$200 million higher than a year earlier, translating into 3 months of import cover.
With regard to fiscal policy, Government undertook measures to address long-standing structural challenges relating to fuel and maize subsidies as well as distortions in the public service pay structure. This was done to reinforce fiscal prudence, as well as enhance productivity for better public service delivery. As a result of these developments, the projected fiscal deficit for 2013 will be 8.5 percent of GDP, compared to the budget estimate of 4.5 percent.

Macroeconomic objectives
The Sixth National Development Plan has been revised to align it with the PF Government’s development agenda.
Macroeconomic objectives for 2014 are to:
a) Achieve real GDP growth of above 7 percent;
b) Create at least 200,000 decent jobs;
c) Attain end year inflation of no more than 6.5 percent;
d) Increase international reserves to over 3 months of import cover;
e) Maintain a fiscally sustainable public external debt level so that debt service and amortization do not exceed 30 percent of domestic revenues;
f) Increase domestic revenue collections to over 21 percent of GDP; and
g) Limit domestic borrowing to 2.5 percent of GDP and contain the overall deficit to no more than 6.6 percent of GDP
To ensure that Government is able to better capture the jobs created in the economy; data collection will be strengthened so that comprehensive labour market information at national and sub-national levels can be produced in a timely manner



Agriculture, Forestry and Fisheries

In the 2012/13 farming season, crop and livestock production had mixed results. The outbreak of army worms at the time of planting and lower than normal rainfall in the southern half of the country led to reduced maize output.
More regrettable was the significant decline in cotton production due to poor pricing in the previous year. Burley tobacco, soya beans, wheat and sunflower however, were among the crops which registered higher production levels. The livestock sub-sector has continued to grow in 2013, with cattle numbers increasing by 10 percent to almost four million and the number of poultry increasing by 18 percent to over 92 million.
Tourism Sector

Zambia successfully co-hosted the United Nations World Tourism Organisation’s 20th General Assembly this year. This is because Government provided targeted tax incentives for the tourism sector in 2013. In addition, Government heavily invested in expansion and rehabilitation of infrastructure at the Harry Mwaanga Nkumbula International Airport, as well as in road infrastructure and social amenities in Livingstone.
Government intends to build on this raised international profile to achieve its development targets for tourism. These include the promotion of product diversification and further investment in tourism infrastructure, including the Kenneth Kaunda International Airport. The aim is to diversify the tourism base by improving accessibility to our national parks, heritage sites and natural attractions. Government will also continue to streamline licensing procedures and enhance capacity in the hospitality industry.
Government has already introduced the hologram to protect income rights of musicians and film makers. In 2014, Government will also complete work on national film policy.
Manufacturing Sector

Government released K106.9 million to the Development Bank of Zambia to support the financing needs of industry, particularly Small and Medium Scale Enterprises. These enterprises also benefited from the resumption of funding through the Citizens Economic Empowerment Fund.
The linkages between the manufacturing and agriculture sectors have been strengthened through the rehabilitation of Nitrogen Chemicals of Zambia.
The removal of customs duty on most electrical and mechanical industrial equipment in 2013, allowed manufacturers to import major capital items at relatively lower costs. As a result of this measure and other initiatives under the Private Sector Development Programme, the manufacturing sector is expected to grow by 4.3 percent in 2013.
In 2014, Government will continue to promote the diversification of manufactured products, especially those with export market potential by, among other things, accelerating the development of the Multi-Facility Economic Zones. The Government remains committed to facilitating value addition in manufacturing with a view to exploiting regional and international export markets and creating more jobs for our youths
Mining Sector

Mining sector performance in the first half of 2013 remained positive. Copper production increased by 13.2 percent in the first half of 2013 to over 374,000 metric tonnes, compared to production over the same period in 2012. This was due to improved mining production techniques, the opening of Lubambe mine and ramping up production at Mulyashi copper mine. On the basis of this performance, copper production from large scale mines is projected to exceed last year’s production level.
Local auctioning of gemstones commenced this year. Government will continue to encourage this initiative and urge small scale gemstone miners to use this approach so that they get better value for their gemstones. Local auctioning will also improve Government’s ability to collect appropriate revenues from the sub-sector.
Private Sector Development

Government will continue to implement reforms aimed at building and enhancing a sustainable legislative and regulatory environment for private sector-led growth. This will include the continuation of business registration and licensing reforms. Key among these are the establishment of provincial one-stop shops for business registration, and the decentralisation of certain elements of the filing procedures for registration to Local Authorities to reduce the cost of doing business.

Infrastructure Development

Transport and Communications Infrastructure
In 2014, Government will continue to implement the Link Zambia 8000 programme. Under this programme, which commenced last year, work is progressing well on over 1,500 kilometres of roads. These include the Pedicle; Mongu-Kalabo; Kalabo-Sikongo-Angola border; Kasama-Mporokoso-Kaputa; Mbala-Nakonde; Mansa-Luwingu; Chipata-Chadiza-Katete; Chama-Matumbo; Isoka-Muyombe-Chama; Kitwe-Chingola; and the Leopards Hill-Chiawa roads as well as the bottom road from Munyumbwe to Chaanga. The programme is expected to promote development of local contracting capacity and create 24,000 jobs throughout the country. Already, 16,000 workers, mainly youths, have been employed.
His Excellency the President launched the Pave Zambia 2000 programme in September this year and work has commenced in Chawama in Lusaka and Petauke in Eastern Province. The Government will scale up this programme in 2014 to cover all the provinces. Once fully operational, this programme will generate income for up to 20,000 workers.
In addition to township roads, the Lusaka 400 programme was launched this year with the aim of decongesting the capital city by constructing 400 kilometres of link roads. I am pleased to report that work on this project has progressed significantly with over 150 kilometres of roads to be completed by the end of this year. This programme is expected to be completed by 2016.
Energy

Government continues to work with the private sector to increase installed electricity generation capacity and improve the transmission infrastructure. The extension of the Kariba North Bank Power Station will add 360 megawatts of hydro power to the installed capacity. By the end of this year, 180 megawatts will be added and the balance will come on stream in 2014. In addition, the Ndola Energy heavy fuel generating project is nearing completion and will contribute 50 megawatts by the end of this year.
With respect to Itezhi-tezhi, financing has been secured and works have progressed, whilst for the Kafue Gorge Lower power station, the tender process to engage a strategic equity partner is in progress. Itezhi-tezhi is expected to come on stream in 2015 with 120 megawatts, while the Kafue Gorge Lower power station with the capacity of 750 megawatts is expected to come on stream in 2019.
Two provincial fuel depots will be completed this year and a third in 2014, with installations in other provinces to follow thereafter. While efforts to upgrade Indeni Oil Refinery will continue in 2014, Government will also explore other options including construction of a new refinery with sufficient capacity to meet the ever increasing demand of our robust economy with surpluses for export.
Health Sector
Government remains committed to bringing affordable and quality health care as close to the family as possible. Accordingly, Government will continue to develop regional hubs to decentralise storage and distribution of medical drugs and supplies to better ensure their availability to all Zambians. Two hubs, in Chipata and Choma have already been established with two more in Mongu and Kasama planned for 2014. In 2014, Government will procure specialised medical equipment and requisite supplies for tertiary level hospitals to ensure non-interruption of services and reduce the number of referrals abroad. Further, Government will continue investing in district hospitals, especially for those districts that are currently not served with first level referral services and will also continue with its programme of constructing 650 health posts.
Education and Skills Development


Government will accelerate the re-introduction of the primary and secondary school system; promote the teaching of life skills to enable learners cope with the demands of self-employment in the labour market; promote the teaching of science and mathematics subjects; construct more technical schools and provide laboratory equipment.
With regard to tertiary education, Government will increase the number of students accessing quality and affordable university and college education by:
a) expanding student accommodation, lecture rooms and libraries at the University of Zambia, the Copperbelt University and Mulungushi University;
b) continuing with the development of infrastructure at Chalimbana and Palabana universities in Lusaka Province, Paul Mushindo and Robert Kapasa Makasa universities in Muchinga Province, Mukuba University on the Copperbelt and Kwame Nkhrumah University in Central Province; and
c) commencing the construction of Luapula University in Luapula Province and King Lewanika University in Western Province.
Monetary and Financial Sector Policies
The Bank of Zambia will maintain price and financial system stability by continuing to implement monetary policy through its interest rate targeting framework. Further, it will strengthen the regulatory framework governing the financial sector by updating and harmonising legislation.
Government will continue to maintain a flexible exchange rate regime with the Bank of Zambia only intervening to smoothen short term volatility. Additionally, the Bank of Zambia will continue to build international reserves to over 3 months of import cover.
Public Financial Management Reforms
With regard to public procurement, the Zambia Public Procurement Authority has already been transformed from an executing institution to an oversight and regulatory institution with procurement functions decentralised to spending agencies.
Therefore, under the Public Financial Management Reforms, Government will accelerate the establishment of a Treasury Single Account to enhance Government’s ability to oversee its accounts and avoid the accumulation of idle funds. Currently, Government is using the Treasury Single Account to fund personal emoluments, transfers to grant aided institutions and capital programmes. Beginning 2014, this will be extended to funding other categories of expenditure.
2014 Budget
Government proposes to spend a total of K42.68 billion or 30.7 percent of GDP. This will be financed through domestic revenues of K29.54 billion as well as grants of K2.63 billion from our cooperating partners. The balance of K10.51 billion will be met through foreign and domestic borrowing.

Allocations


General Public Services
Government has set aside K10.73 billion or 25.1 percent of the Budget for General Public Services which includes allocations for infrastructure development for the new districts, inter-governmental fiscal transfers and debt payments. Combined, these three account for 56.5 percent of this allocation.
Economic Affairs

Government has allocated K11.94 billion to economic sectors, representing 28.0 percent of the Budget.
·         Key interventions include the countrywide construction of dip tanks and silos for which an allocation of K231.9 million has been provided. The target is to increase the number dip tanks to combat animal disease and increase grain storage capacity to 1.3 million metric tonnes by the end of 2014. In addition, K80.9 million has been allocated to develop irrigated agriculture.
·         K500 million for the Farmer Input Support Programme to facilitate the provision of affordable crop and livestock inputs for our small scale farmers.
·         To secure and maintain the 500,000 metric tonnes of strategic food reserves, K1.0 billion has been set aside in the 2014 Budget.
·         K6.07 billion or 14.2 percent of the Budget has been allocated to the transport sector to construct, rehabilitate and maintain road, rail, water and air infrastructure.
·         K5.13 billion of this is earmarked for the Link Zambia 8000 Programme, PAVE Zambia 2000 project, the Lusaka 400 project and feeder roads in the rural areas.
·         With regard to the rail subsector, Government has allocated K339.8 million to recapitalise TAZARA and rehabilitate Zambia Railways Limited. The quality of rail travel for both goods and the public will improve and the negative impact on the nation’s roads from heavy commercial traffic will be mitigated.
·         K250 million for other critical interventions in the transport sector. These include the procurement of radars to bring our air safety levels to world standards, and dredging equipment and water vessels to improve water transport in the country.
·         In the energy sector, K550 million has been set aside for the power rehabilitation project under Zesco while K65 million has been allocated for the Rural Electrification Programme.
Education
·         K8.61 billion or 20.2 percent of the Budget on education. Out of this amount, K1.28 billion will go towards the construction of education infrastructure which will include 53 new secondary schools and the upgrading of 220 basic schools into secondary schools. Government will also construct an additional 150 primary school classrooms in the rural areas with corresponding 150 teacher houses, by using the community mode method.
·         Included in the education sector infrastructure budget is K404.3 million for university and other tertiary infrastructure, in particular student hostels at the University of Zambia, Copperbelt and Mulungushi Universities while an additional K395.3 million has been provided for operational grants for universities, student tuition and bursaries.
Health
·         9.9 percent of the Budget, or K4.23 billion on health services in 2014. Within this amount, K245.7 million is provided for the construction and rehabilitation of district hospitals, health centres, training schools and the upgrading of tertiary health care.
·         In order to enhance the availability of essential drugs and medical supplies, the budget in 2014 for these items has been increased by 24.3 percent to K738.7 million from K594.1 million in 2013. A further K66.6 million has been provided for medical equipment including the specialised equipment I mentioned earlier.
Public Order and Safety
·         K2.12 billion. To begin to redress the deplorable conditions in our prisons, K21.9 million has been allocated for expanding and improving prison infrastructure with a further K22.6 million allocated to prison farms so as to improve the nutrition of in-mates.
·         K27.2 million to procure digital forensic equipment and a mobile forensic laboratory, among others.
·         A total of K661.0 million has been allocated for housing and community amenities. Of this amount, K417.8 million has been budgeted for the provision of safe water and sanitation in both rural and urban areas.
Social Protection
·         K1.18 billion for social protection programmes in 2014. A large part of this increase arises from higher allocations to the Public Service Pension Fund, which will receive K754.2 million, in addition to the employers’ contribution.


Revenue Estimates and Measures

Revenue Measures
·         Increase excise duty on airtime from 10 percent to 15 percent.
·         Duty on clear beer from 40 to the duty rate of 60 percent. The revenue gain from these measures is K514.8 million.
·         Increased the property transfer tax rate from the current 5 percent to 10 percent. The measure is expected to generate an additional K100 million.
·         Charge at the rate of 0.2 percent of the value transferred on money transfer service to a recipient within or outside the Republic of Zambia. This measure will bring to the Treasury K180 million.
Rationalisation of the Tax System
·      Expand the Value Added Tax base by shifting several categories of zero rated goods and services to the standard rated category. This will generate a revenue gain of K151 million.
·      To equalize tax treatment between branches and subsidiaries and prevent tax avoidance, I propose to extend the withholding tax to profits distributed by branches of foreign companies. This will generate additional revenues of K1 million.
·       withholding tax on payments to non-residents on royalties, management and consultancy fees is at 20 percent
·      Withholding tax on commissions, public entertainment fees and payments made to non-resident contractors to 20 percent. This measure will result in a revenue gain of K71.7 million
·      Change the taxation of rental income by reducing the withholding tax to 10 percent from 15 percent and make this a final tax. As such, turnover tax on rental income shall not be applicable.
·      As a way of further stimulating the booming property sector, which is a source of employment creation, It has been propose to exempt from withholding tax interest arising from the debenture part of a property linked unit paid to Zambian investors in any Property Loan Stock Company listed on the Lusaka Stock Exchange.
·      In order to broaden the tax base, I propose to introduce a withholding tax of 20 percent on winnings from gaming, lotteries and betting and make it a final tax.
Streamlining of Tax Incentives
Any investor, foreign or local, who pledges to invest at least half a million United States dollars in a priority sector or product, as declared under the Zambia Development Agency Act, is entitled to tax incentives. In particular, they are exempt from paying duty for the first five years, are entitled to a five year income tax holiday and benefit from a further five years of preferential income tax rates.
Align the sectors declared as priority under the Zambia Development Agency Act to the Revised Sixth National Development Plan
Current PAYE Regime Income Band
Tax Rate
0 - K2,200 per month
0%
K2,201 – K3,000 per month
25%
K3,001 – K5,900 per month
30%
Above K5,900 per month
35%

Proposed PAYE Regime Income Band
Tax Rate
0 - K3,000 per month
0%
K3,001 – K3,800 per month
25%
K3,801 – K5,900 per month
30%
Above K5,900 per month
35
                                                                    
 Non Tax Revenues
·         As part of its comprehensive land reform programme, Government has launched the Integrated Land Management Information System whose benefits, among others, are to strengthen the administration of land and regularise land ownership through surveying and titling of land country wide. This measure will improve certainty of land location and ownership, enhance security of tenure for both customary and state land, improve transparency in land transaction procedures and increase revenue collection among others.
·         Toll fees collected from toll gates based on the Road User Pay principle is one of the most sustainable sources of financing for the roads. The Government has embarked on tolling of selected major roads whose proceeds will be channelled to the rehabilitation and maintenance of roads country wide. Tolling of commercial traffic will commence before the end of this year using the existing weigh bridge infrastructure.
·         Revise upwards various fees and fines to bring them to appropriate cost recovery levels of providing the respective services. These fees include those collected by the Ministry of Lands. Natural Resources and Environmental Protection, Ministry of Information and Broadcasting Services, Ministry of Mines, Energy and Water Development and Ministry of Home Affairs. These measures will take effect from 1st January, 2014.
·         Government will raise an estimated K550 million from these non-tax measures in 2014.


Short Comings (Authors view)
This Budget is a decent attempt at creating equity in resource allocation, that being said they are some shortfalls.
In my personal view there are certain short comings in this budget which need to be addressed in this budget.

Public sector reforms
Public sector pay has been characterised by distortions in salary levels and inequities in other conditions of service. In 2013, Government has fast-tracked the implementation of the reforms, especially to benefit the lower paid public workers.
Review of public pensions
Enhancement of the public service performance management system and the creation of a public service credit union to replace the various loan schemes  that are currently in place need to be managed with the utmost prudence.
Pension Reforms
A good pension system should subscribe to the basic principles of affordability, sustainability, portability, wide coverage and adequacy. The current pension systems, particularly the public pensions, clearly fall short of these principles. The public pension funds for instance, are fiscally unsustainable, not transferable between jobs and are unable to meet the minimum living requirements of retirees. Over the medium to long term, Government will implement wider reforms.
The Public Service Pension Fund has huge deficits that are projected at K2.9 billion in 2014, K2.6 billion in 2015 and K2.8 billion in 2016. Given that the Public Service Pension Fund is wholly owned by Government, it means that these deficits have to be funded from tax payers’ money. Against the backdrop of significant fiscal challenges that we are experiencing to mobilise sufficient resources for development, pension reforms can no longer be avoided.

Government intends to implement changes to the Public Service Pension Fund that will include changing the retirement age; revising the basis for calculating the pensionable emoluments and reviewing the commutation factors. My concern is here is that if the retirement age is increased, the number of job openings will reduce for incoming graduates and other workers. In essence this could change labour demographic dynamics in a negative way.

Agriculture
The allocation of K500 Million and K1 Billion to the FISP and FRA respectively heavily skews agricultural finance to none research oriented projects. A little portion of this money could have gone into strengthening the research capacity. More research can be done in disease and crop marketing. However the constructing multi-purpose dams and irrigation schemes to limit dependence on rain-fed agriculture is a welcome initiative.

Tourism Sector
Value added Standard rate for the supply of All distinct tourism services including game viewing, bungee jumping, and Pre-booked tour packages booked after 1 January, 2014, could possibly hurt the tourism Industry depending on the elasticity of such services
Manufacturing Sector and SMEs
It appears that incentives for investors remain skewed towards big corporations with finance to qualify for MFEZ and ZDA tax incentives. The portion of finance allocated to the growth of SMEs is at K106.9mil is relatively small What SMEs need is not only finance but a healthy environment that fosters their growth. In this regard some more key incentives for SMEs could be implemented to cushion some of their costs. SMEs hire their most people in the labour force and will help create the much needed Job growth.
There was not sufficeient finance allocated to the value addition process, especially in agriculture and copper.
Infrastructure

K618.5 million from the Eurobond proceeds was earmarked for track rehabilitation and procurement of rolling stock for Zambia Railways. Progress has been lethargic due to procurement delays and administrative bottlenecks. This sort of management of infrastructure funds is not prudent and serves to undermine the completion of earmarked projects. The reason Eurobond money was under the auspice that the projects had already been identified. A bureaucratic procurement process doesn't help at all.

References
2014 Budget Address by the Minister of Finance
London Metal Stock exchange
Bank of Zambia
Central statistics Office

Tuesday, September 18, 2012

Zambia's $750 mil EuroBond :Talk time example

A need has arisen to explain the recent Eurobond issue by the Zambian Government using an example that everyone can relate to and understand, talk time.
Now Airtel, a mobile service provider in Zambia, has a promotion called Siliza. This allows you to borrow air time when you have nothing in your account. We shall use an adapted version of this promotion to explain the Euro Bond.
Now before we begin, we must explain two key terms that are vital to understanding a Eurobond. The first is the Principal; this is the amount that is borrowed to be paid back at the maturity of the Bond which is after the period of the bond has elapsed in this case 10 years.
The next term is called the Coupon Rate; this is a rate of interest Annually. The Coupon rate is calculated as a percentage of the principal in this case the coupon rate is 5.375%.
We can now get to the example that uses talk time to explain the Eurobond. Let us take for example a guy by the name of Chuck Bass who puts K 50, 000 talk time in his phone every day. On one fateful day, Chuck Bass runs out of talk time making a call to his girlfriend Blair, and since he needs to tell her that he loves her he decides to borrow K 7,500 from Airtel like a Eurobond to be paid after 10 days. This is what will happen; since Chuck Bass puts K 50,000 in his phone account every day, and the coupon rate is paid bi-annually, Airtel will take 5% of the amount he borrowed after every day 2.5% after every 12 hours which is half a day(bi annual is half a year).
Now 5% of K 7, 500 is K375, which means Airtel will deduct K187.5 (2.5%) after every 12 hours and  per day Airtel will deduct K375 .This will happen for the next 10 days, after which Chuck Bass will pay the principal (K7,500)through his phone account and the balance would have been cleared.
Now to relate this to the Euro Bond, the principal which is the money that the Zambian Government borrowed is $750 million and the annual budget for Zambia as from last year’s figures is $5 billion.
The coupon rate paid is 5.375% but we round it off to 5%.Now what follows here is important. The money that Chuck Bass borrowed which is K 7, 500 represents the money that the Zambian Government has borrowed which is $750 million. The money that Chuck Bass puts in his phone account every day which is K 50, 000 represents the annual budget of Zambia which is approximately $5 billion.
The 10 days that it takes Chuck Bass to pay back the borrowed Airtime represent the 10 years it will take the Zambian government to pay back the principal and the coupon in Full at maturity.
The same way you would calculate how much Chuck Bass pays Airtel is the same way you would calculate how much the Zambian Government will pay Euro Bond holders.
Note that Chuck Bass is a fictional character; any resemblances in person or by chance are completely unintentional.

A note has to be included on the time value of money as the reason why bonds exist.Inflation reduces the value of money gradually so hence bonds are the best way to prevent loss of value through the time value of money.
It must also be noted that capital projects  go hand in hand with long term bonds like building a hydro power station which have high return afterwards and can pay of its dues effectively.

Thank you goes to Mr Masengo for correcting the coupon payments part of this example.
Kampamba Shula BSc Economics

Zambia's $750 MIL Euro Bond Explained in Simple English

I was having a discussion with a friend yesterday about the recent Euro Bond that Zambia issued.He didnt seem to understand so I gave him an example with which he could relate to.
My friend is a bricklayer and works peacework sometimes which varies in amounts,but lets put an estimate of K10,000 a day.
Everyday he comes to the bar to have a drink of his favourite brew "shake shake".Now for example assuming one day food runs out at home and he has to spend his last money on food and does exaclty that, leaving him nothing for his favourite brew.
Assuming he still wants to drink,he agrees with the bar tender that he will borrow one packet of brew which costs K2500 and will pay it back like a Euro Bond over 10 days.
Now Follow me, this means he will pay the coupon rate of 5% everyday for 10 days.This means he will pay the bartender K125 (5% of K2500) everyday for 10 days.
At the end of the 10 days he will pay the bar tender the original K2500 for the brew and his debt will be cleared.
Now, the 10 days represents 10 yrs,the K2500 represents a quarter of K10,000 which is the same as $750 million which Government borrowed as a quarter of Zambia's annual budget of $3 billion.The coupon rate is 5.375% to be exact but everything is exactly done in the same way as the example above.
Any Questions???

Monday, September 17, 2012

Zambia's Inaugural $750 million Bond Evaluated By Kampamba Shula


Zambia has issued a USD 750 Million inaugural International Bond which was over-subscribed 24 times by 425 Global Investors, thereby representing Sub-Saharan Africa’s largest ever book order.
ISSUES TO CONSIDER
1. Conducted 5-day roadshow covering the key institutional accounts in London, Los Angeles, San Francisco, Boston and New York.
2. Inaugural 10-year International Bond Issue.
3. Raised US$750 million at a coupon of 5.375%.
4. Only the second international bond issuance from Sub-Saharan Africa in 2012 year-to-date(first issuance South Africa’s 2024 offering).
5. Testifies to the potential of Zambia’s economy and the strength of international investor interest in the country.
6. The transaction was announced prior to the U.S. markets opening at 5.30am (EST) on 13 September 2012.
7. Order book of approximately US$12 billion from over 425 investors globally.
8. Transaction priced intraday on an accelerated basis within approximately 6 hours of announcement.
9. The transaction boasted the largest orderbook ever and lowest coupon achieved by a Sub-Sahara African debut international bond issue.
10. Transaction primarily attributed to US investors (56%), followed by those in Europe (40%), Asia (3%) and others (1%). The high quality of investor participation is reflected in the broad distribution to various investor types including Fund Managers receiving 85% of allocations, followed by Private Banks / Banks 8%, Pension / Insurance Funds 5% and others 2%.
11. Barclays and Deutsche Bank acted as lead-managers and joint book-runners on the transaction.

Economeka Consulting (Kampamba Shula)

Last year in his budget the Honorable Finance Minister Alexander Chikwanda announced the Zambian Government's plan to go to the International capital market to issue a first sovereign bond in the amount of $500 million.
This route was an alternative source of financing to secure resources for service delivery by the Zambian Goverment particularly for road and energy infrastructure development.
Those expectations where exceeded on 13 september 2012 when the Zambian goverment issued an inaugural 10 year bond issue to the tune of $750 million.This was on account of the exceeding large order book with a total subscription of $11.9 billion, which works out at 24 times over and above the intended amount of $500 million.
This is not only the largest order book for sub saharan africa but also at 5.375% the lowest coupon rate,meaning the most favorable price.
The fact that zambia is able to garner such huge and unprecedented interest from the international investor community is testimony of the confidence the world reposes in zambia.
According to a statement from the minister all borrowings are intended to be spent on growth projects and social sectors of health and education.The minister hinted at a predominance of funding outlays towards the power sector, for instance $186 million will be allocated towards the Zambian Government's equity into the kafue gorge lower hydro power scheme.
The minister said it is important to use this goodwill to get on a sustainable growth trajectory.I concurr with his view.
There are a few recommendations I would like to suggest in the use of these funds.Given that some funding will go to health and education ,clear lines of accountability and responsibility need to be drawn to give clarity on the trajectory.
As the minister noted most of the funding outlays should be directed at the energy sector.My recommendations would be to look at alternative sources of energy.If zambia is to get on a path of sustainable development we cannot ignore alternative energy sources.The reason for this is the unsatisfied need for industry in zambia.

We need energy to supply further mining projects in the country,large scale manufacturing and retail.The current state of energy supply is inadequate for such ambitious ideals.

In the health sector, funding should be availed to create hospitals and clinics especially for rural areas.
In this regard I am referring to creating facilities that would change the health lanscape in rural areas.In addressing the ever present dilemna which is HIV/AIDS, sustainable treatment facilities should be created.
According to Jane Phiri a practising registered nurse “It is undoubtedly true that health in rural Zambia is beset by a plethora of problems that can be summarised into five broad themes; limited access to preventive measures, appalling primary health care, lack of medicines, use of unqualified personnel and poor infrastructure for both patients and staff.”Funding aimed at directly addressing these issues would fit well on a sustainable growth trajectory.

In education, funding should be used to upgrade the standard of education in Government schools by purchasing books,computers and other useful equipment that will make learning more interactive for pupils and teachers.Funding should also be used to improve the sports facilities in learning institutions which have been left unattended to for a while now.
Back to the power sector which seems to be the only sector with which clarity on funding has been availed,my recommendation for alternative power sources would be Solar power energy  and Nuclear power stations.

Below is a link to the Minister of Finance Address
Minister of finance statement on International Bond

The last and possibly most important sector that the Zambian government should invest this EuroBond money is the railway system.The railway sytem has suffered in recent years due to mismanagement of resources or as the Minister Mr Chikwanda put it as "due to high unacceptable levels of derailments, loss of life and property."
This investment will ease pressure on the roads which are not able to handle some of the heavy loads of cargo being moved through them and create the much needed jobs and money in people's pockets.